Wellesley - Line 86 (Wallenstein) Upgrades

Share on Facebook Share on Twitter Share on Linkedin Email this link

This project supports the Region of Waterloo's strategic focus area(s): An icon representing the Region's strategic focus area, Sustainable transportation.

Line 86 (Wallenstein) Upgrades

from 300 m West of Herrgott Road to 100 m East of Listowel Road

The Region of Waterloo is completing upgrades to a section of Line 86 through Wallenstein that will improve the infrastructure for vehicles, pedestrians, cyclists, and buggies travelling through the corridor.

Roadway improvements for Line 86 include:

  • Full reconstruction of the pavement structure
  • New curb and gutter in Wallenstein
  • Installation of new stormwater management measures to improve drainage
  • Improved pedestrian, cycling and buggy facilities
  • Utility relocation where necessary, to accommodate these improvements

* The scope of this project does not include the missing section of the Rail Trail (known as Guelph to Goderich Trail or Kissing Bridge Trail)

Refer to Appendix B for proposed cross sections along the project limits.

Improvements for this section of roadway are expected to be completed by November 2022 .

Please submit your comment form or any other questions or comments to:

Larry Van Wyck, C.E.T. | Project Manager | Region of Waterloo | 150 Frederick Street, 6th Floor | Kitchener, ON N2G 4J3 | Telephone: (519) 240-7114| Email:lvanwyck@regionofwaterloo.ca






This project supports the Region of Waterloo's strategic focus area(s): An icon representing the Region's strategic focus area, Sustainable transportation.

Line 86 (Wallenstein) Upgrades

from 300 m West of Herrgott Road to 100 m East of Listowel Road

The Region of Waterloo is completing upgrades to a section of Line 86 through Wallenstein that will improve the infrastructure for vehicles, pedestrians, cyclists, and buggies travelling through the corridor.

Roadway improvements for Line 86 include:

  • Full reconstruction of the pavement structure
  • New curb and gutter in Wallenstein
  • Installation of new stormwater management measures to improve drainage
  • Improved pedestrian, cycling and buggy facilities
  • Utility relocation where necessary, to accommodate these improvements

* The scope of this project does not include the missing section of the Rail Trail (known as Guelph to Goderich Trail or Kissing Bridge Trail)

Refer to Appendix B for proposed cross sections along the project limits.

Improvements for this section of roadway are expected to be completed by November 2022 .

Please submit your comment form or any other questions or comments to:

Larry Van Wyck, C.E.T. | Project Manager | Region of Waterloo | 150 Frederick Street, 6th Floor | Kitchener, ON N2G 4J3 | Telephone: (519) 240-7114| Email:lvanwyck@regionofwaterloo.ca






  • CLOSED: This survey has concluded.


    The public is invited to review the improvements being considered for this project and provide input regarding the proposed design for the Upgrades of Line 86 (Wallenstein). For more information review the Information Package.

    The survey will take about 10 minutes to complete. The survey will close on October 5, 2021. 

    NOTE: All comments submitted will be posted publicly for this project and any identifying information will be removed. This means that comments may be reported exactly as written on the Region's website, on the EngageWR page for this project, the Region's social media and/or Council report.

    All comments and information provided become part of the review process and are being collected to assist the Region of Waterloo in completing the planning and design for the Line 86 (Wallenstein) Road Improvements. All submissions will become part of the public record files for this matter. Personal information collected is under the authority of the Municipal Act, 2001 and in compliance with the Municipal Freedom of Information and Protection of Privacy Act, R.S.O. 1990. Questions about the collection of personal information should be directed to Larry Van Wyck, Project Manager at lvanwyck@regionofwaterloo.ca(External link) or 519-575-4400 (TTY 519-575-4608)