Construction Update October 3, 2022
Weber Street construction is ongoing with work currently proceeding between Dutton Drive and Albert Street and at Cedar Creek Culvert.
Work conducted since last update:
- Installed new box culvert at Cedar Creek
- Installed watermain between Albert Street and Dutton Drive
- Completed road base and installed concrete curb from Blythwood Road to Belcan Place
- Poured colored concrete boulevard on east side of Weber Street
Works planned for October:
- Complete remaining Cedar Creek culvert works
- Complete road base and concrete curb from Belcan Place to Dutton Drive
- Complete multi-use trail on east side of Weber Street
- Install permanent traffic signal at Albert Street intersection
- Pave base asphalt and reopen Weber Street to two-way traffic