What is the scope of work?

    The City of Cambridge is proposing to reconstruct Maple Ridge Road from Wellington South to Harris Street and Wellington South from Bruce Street to Maple Ridge Road.

    For Maple Ridge Road the reconstruction will include

    • Replacement of the existing watermain, appurtenances and services to property line
    • Replacement of the existing roadway, curb and gutter and sidewalk For Wellington South the reconstruction will include
    • Replacement of the existing watermain, appurtenances and services to property line
    • Replacement of the existing sanitary sewer, appurtenances and services to property line
    • Replacement of the existing storm sewer and appurtenances
    • Replacement of the existing roadway, curb and gutter and sidewalk

    Are there any changes proposed to the existing streetscape?

    Maple Ridge Road from Wellington South to Harris Street

    Yes. The complete roadway including curbs and sidewalks will be reconstructed. The width of the existing asphalt surface is approximately 8.3m from Wellington South to Harris Street. The width of the existing sidewalks on the east and west sides of the road is approximately 1.2m. The width of the grass boulevard between the concrete curb and sidewalk on both sides is approximately 0.7m.

    The width of the proposed asphalt will be 8.0m, approximately 0.3m narrower than the existing asphalt.

    The width of the proposed sidewalks on the east and west sides of the road will be increased to 1.5m as per the Accessibility for Ontarians with Disabilities Act (AODA). A 0.5m wide grass boulevard between concrete curb and sidewalk is proposed. The proposed sidewalks will be approximately in the same location as the existing sidewalks except that they will be widened toward the road.

    Wellington South from Bruce Street to Maple Ridge Road

    Yes. The complete roadway including curbs and sidewalks will be reconstructed. The width of the existing asphalt surface is approximately 5.75m from Bruce Street to Maple Ridge Road. The width of existing sidewalk on the east side of the road is approximately 1.2m. On the west side there is no sidewalk. There is no boulevard between the sidewalk and the concrete curb.

    The width of the proposed asphalt will be 6.0m, which is approximately 0.25m wider than the existing asphalt.

    The width of proposed sidewalk on the east side of the road will be increased to 1.5m as per the Accessibility for Ontarians with Disabilities Act (AODA). A 0.3m wide impressed concrete boulevard between concrete curb and sidewalk is proposed. The proposed sidewalk on the east side will be approximately 0.15m closer to the property line than the existing sidewalk and it will be widened toward the road.

    Why is the City proceeding with this work?

    The City of Cambridge upgrades infrastructure each year in order that aged facilities are replaced prior to there being a complete failure or the cost of maintenance becomes exorbitant. The existing watermain, storm sewers and sanitary sewers will be also replaced due to age and deterioration. All service laterals will be replaced to the property line. Reconstruction of the road and concrete surface works is necessary due to deterioration and reconstruction of the underground services.

    Can I upgrade my existing sanitary sewer and water service?

    All water service laterals for single families will be replaced with 25mm diameter polyethylene pipe from the watermain to property line and all sanitary service laterals will be replaced with 100mm diameter PVC pipe from the sewer main to property line.

    Any property owner wishing to have new (additional) or larger sized services must make written application to the City of Cambridge. Any new or upgrade service will be at the expense of the property owner making the request. Should you require a new or upgraded service, please contact Matt Holland of the Community Development Department at 519-623-1340 ext. 4751 so that your requirements can be incorporated as part of the construction.

    Please note that the service installed would be to the property line only. Any work on private property would be the responsibility of the property owner who must obtain a permit under the Plumbing Code from the City’s Building Department.

    What is the timing of the reconstruction?

    Construction is expected to take place in 2025 subject to budget approval.

    Who will be doing the work?

    A private contractor selected through the City’s public tender process will undertake the work.

    How will the reconstruction affect me?

    During road reconstruction, it will be necessary to close the road to through traffic. Access to private property may be possible, but it will be at your own risk, as you will be traveling through a construction zone. For times you do not have access to your property, or if you do not wish to travel through the construction zone, alternate arrangements should be made for parking. Overnight parking will be permitted on intersecting streets within one block of the reconstruction but you must abide by all other existing parking restrictions (i.e. don’t block a driveway, don’t park too close to a fire hydrant, don’t park where parking is prohibited, etc.).

    How will pedestrian access be maintained?

    To minimize disruption to pedestrians, the construction crew will:

    • Maintain the existing sidewalk until its removal is absolutely necessary;
    • Provide a temporary gravel sidewalk between removal of the old and placement of the new sidewalk;
    • Whenever possible, provide advanced notice to the property owners and residents whose sidewalk or driveway will be temporarily affected

    Will sanitary sewer and water services be interrupted?

    Sewer and water service will be maintained throughout the duration of construction. However, short interruptions can be expected, particularly when the services to individual properties are transferred from existing mains to the new mains. In the majority of cases, interruptions will be limited to a few hours and will occur during normal working hours. Advance notification will be provided where possible prior to any planned service interruption. During watermain reconstruction, a temporary above ground watermain may be installed. Each property will be connected from the temporary main to an outside water tap. Access onto your property will be required to provide the temporary connection.

    How will disruptions be minimized?

    One issue of critical importance to the City of Cambridge is to have the work completed while minimizing disruption to the neighbourhood. Road reconstruction and underground servicing is disruptive and at times will create noise, vibration due to compaction and a potential for dust. To address these disruptions, water and calcium chloride are used for dust control and construction activity is limited to daylight hours after 7:00 a.m.

    What will happen to surface features existing on City property?

    On some reconstruction projects we find that residents have constructed gardens, shrubs, hedges, and fences within the City road allowance. If existing services are below that particular feature, there is a grade change or if the location of the sidewalk changes, you will be asked to relocate the garden, hedge etc onto your property prior to construction taking place.

    When reconstructing the sidewalk, it may be necessary to cut back some driveways to match the new grade. If this is the case, the driveway will be saw-cut and a patch placed using the same material if possible. Impressed or coloured concrete driveways cannot be replaced to match the original, which is also the case with paving stone driveways (unless the owner has a supply of matching stones that the contractor could use).

    If you have a sprinkler system installed along the edge of the roadway or sidewalk within the City’s road allowance, please remove the piping prior to construction as the contractor will not be responsible for damage and the City will not replace it. You may have it reinstalled on private property after construction is completed if you wish.

    Will blue box, green box and refuse collection be affected?

    Blue box, green box and refuse collection will be maintained throughout the duration of construction. When access is restricted by construction operations, the construction crew will place the blue boxes and refuse containers at a location accessible by the collection service on collection days. 

    To minimize problems during construction, it would be appreciated if all refuse is bagged – Yard Waste in paper bags, Household Garbage in plastic bags. Please ensure that your address is clearly marked on containers/ blue boxes.

    How can I voice my comments?

    The City of Cambridge realizes that reconstruction will cause inconvenience to the residents and businesses in the area and requests your cooperation, understanding and patience throughout its duration. 

    In addition to your comments on this project page, other information we would like to receive from residents or institutions include your special needs, e.g. for persons with disabilities, water or sewer service improvements or driveway modifications. This written record will assist the City to address all the issues related to the reconstruction.  