
Application to amend the Official Plan, Zoning By-law, and Draft Plan of Subdivision for 400 Millennium Blvd
Changes to the Official Plan and the Zoning By-law for this location are required before a permit can be issued. This means that applications have been submitted that are reviewed by City planners, other agencies, and City Council before anything can be built.
The developer, Activa, is proposing to build a mixed-use development that would consist of new residential and commercial buildings with recreation and conservation lands at 400 Millennium Boulevard. The plan of subdivision consists of single detached buildings, townhouse buildings, mixed-use medium density residential buildings, commercial buildings, a public park and stormwater management pond.
Official Plan Amendment request include:
- re-designating the lands from employment use only to low density residential, mixed-use medium density residential, commercial and open space
- amend special provision area (SPA) 26
Zone change request includes:
- rezoning the lands from Business Employment One (E1-27) to the following zones:
- Residential Five (R5) with site-specific provisions
- Residential Seven (R7) with site-specific provisions
- Residential Mixed-Use (RMU-20) with site-specific provisions
- Convenience Commercial (C3-20)
- Parks and Recreation (OS1)
- Conservation (OS3)
Site specific provisions proposed for R5 zone:
- increase maximum building height to 11m and 3 storeys, whereas the maximum building height is 9.5m
- increase maximum deck height to 3.5m from permitted 3.0m
- allow a one storey unenclosed porch to encroach by a maximum of 0.6m into the flankage yard
- allow a private garage to be up to 58% of the front building façade length, whereas 55% is permitted
Site specific provisions proposed for the R7 zone:
- reduce minimum lot area for interior lots from 185 sq. m. to 155 sq. m. and corner lots from 400 sq. m. to 345 sq. m. for a freehold townhouse
- Reduce minimum side yard setbacks from 1.8m to 1.2m for a freehold townhouse
- increase maximum building height to 11m and 3 storeys, whereas the maximum building height is 10m
- minimum interior lot line setback of 5.5m adjacent to OS3 zoned lands, whereas 7.5 m is required
- exemption from maximum density of 150 bedrooms per hectare
- increase maximum lot coverage from 40% to 55% for freehold townhouses
- allow a private garage to be up to 60% of the front building façade length for a freehold townhouse or townhouse building
- increase maximum deck height to 3.5m from permitted 3.0m
- allow a one storey unenclosed porch to encroach by a maximum of 0.6m into the front yard and/or flankage yard
Site specific provisions proposed for RMU-20 zone:
- delete freehold townhouse building as a permitted use for lands zoned RMU-20
- allow flexibility in commercial uses within Block 1 (Stage 2) by permitting uses permitted within C3 zone
- allow provision of the RMU-20 zone, including parking, to apply to triplex buildings, townhouse buildings, and stacked townhouse buildings, whereas the By-law requires that the R8 zone provisions apply
- that the cluster development provisions of the By-law not apply
- minimum interior lot line setback of 5.5m adjacent to OS3 zoned lands, whereas 7.5 m is required
- increase maximum deck height to 3.5m from permitted 3.0m
View the documents submitted by the development company under supporting documents on this page for more details and drawings.
Building height, units, housing types
Tallest single detached/semi-detached/townhouse: 11 metres
Tallest multi-unit building: 20 metres
Housing types: apartments, townhouses, semi-detached, single detached
Number of units: 583-634 residential units
You can provide feedback to the planning department, and it will be shared with the council, or ask a question to learn more about this application.
Images are provided by the applicant and may not reflect the final design approved by the planning division.
Give your feedback
Ask a question, read answers
Questions and answers will be published on this site for public viewing. If your username includes your first or last name, or your email address, these will be available for public viewing. Do not include personal or identifying information in your question; if your question is of a personal nature, consider contacting a member of the project team directly. For more information, please refer to our privacy policy.
Questions will be answered by a member of the Planning department within two business days. Some questions may require more time but they will be answered as soon as the information for the response can be collected.
To ask a question you must create an account or log in.
These are the people that are listening and responding to your questions.
The Project Team
{{question.description}}