Kitchener: Conestoga College Bus Stops

The Region of Waterloo is currently considering improvements to the bus stops at Conestoga College Doon Campus. Based on technical studies and investigations completed to date, the Project Team is proposing the following improvements at Conestoga College Doon Campus:

  • Nine (9) new bus bays with a transit-only entrance and exit off of Doon Valley Drive;
  • Canopies and shelters, including on-demand heating and scheduling display panels;
  • Covered bike parking;
  • Multi-use trail connection to Doon Valley Drive; and
  • Benches and landscaping.

The public is invited to review the improvements being considered for this project, ask Region of Waterloo staff questions, and provide input regarding the planning and design of the improvements being considered.

Please refer to the Document Library to read the Information Package and review drawings showing the Preferred Design Concept.

Feedback can be provided online through the survey below or in person at our Public Consultation Centre on February 25th from 3 - 6 p.m. in Room 103 in the Welcome Centre at Conestoga College Doon Campus.

Use the subscribe button on this page to receive an email notification with future project updates.


The Region of Waterloo is currently considering improvements to the bus stops at Conestoga College Doon Campus. Based on technical studies and investigations completed to date, the Project Team is proposing the following improvements at Conestoga College Doon Campus:

  • Nine (9) new bus bays with a transit-only entrance and exit off of Doon Valley Drive;
  • Canopies and shelters, including on-demand heating and scheduling display panels;
  • Covered bike parking;
  • Multi-use trail connection to Doon Valley Drive; and
  • Benches and landscaping.

The public is invited to review the improvements being considered for this project, ask Region of Waterloo staff questions, and provide input regarding the planning and design of the improvements being considered.

Please refer to the Document Library to read the Information Package and review drawings showing the Preferred Design Concept.

Feedback can be provided online through the survey below or in person at our Public Consultation Centre on February 25th from 3 - 6 p.m. in Room 103 in the Welcome Centre at Conestoga College Doon Campus.

Use the subscribe button on this page to receive an email notification with future project updates.


  • CLOSED: This survey has concluded.

    Interested members of the public are invited to fill out this Survey or the Comment Sheet that will be provided at the Public Consultation Centre.  All comments received will be considered along with other information received over the course of the project to assist the Project Team in completing the planning and design for the Conestoga College Bus Stops.

    The survey takes approximately 10 minutes to complete, and will remain open until March 10, 2020.

    Interested members of the public are invited to fill out this Survey or the Comment Sheet that will be provided at the Public Consultation Centre.  All comments received will be considered along with other information received over the course of the project to assist the Project Team in completing the planning and design for the Conestoga College Bus Stops.

    The survey takes approximately 10 minutes to complete, and will remain open until March 10, 2020.

    Take Survey