Structure 400172 Replacement – Greenhouse Road

Share Structure 400172 Replacement – Greenhouse Road on Facebook Share Structure 400172 Replacement – Greenhouse Road on Twitter Share Structure 400172 Replacement – Greenhouse Road on Linkedin Email Structure 400172 Replacement – Greenhouse Road link

The Township of Woolwich has undertaken a Municipal Class Environmental Assessment to study the structural and physical deficiencies associated with Structure 400172 on Greenhouse Road. The purpose of this study is to determine the need and short- and long-term plan for the crossing. An integral component of this study will be consultation with directly affected stakeholders, agencies and the general public. The preferred alternative is replacement of the existing structure with a two-lane bridge. Construction is scheduled to commence on June 26th, 2024 and take approximately 3 months to complete.

The Township of Woolwich has undertaken a Municipal Class Environmental Assessment to study the structural and physical deficiencies associated with Structure 400172 on Greenhouse Road. The purpose of this study is to determine the need and short- and long-term plan for the crossing. An integral component of this study will be consultation with directly affected stakeholders, agencies and the general public. The preferred alternative is replacement of the existing structure with a two-lane bridge. Construction is scheduled to commence on June 26th, 2024 and take approximately 3 months to complete.

Page last updated: 20 Jun 2024, 09:48 AM