Structure 400172 Replacement – Greenhouse Road

Share on Facebook Share on Twitter Share on Linkedin Email this link

The Township of Woolwich has undertaken a Municipal Class Environmental Assessment to study the structural and physical deficiencies associated with Structure 400172 on Greenhouse Road. The purpose of this study is to determine the need and short- and long-term plan for the crossing. An integral component of this study will be consultation with directly affected stakeholders, agencies and the general public. The preferred alternative is replacement of the existing structure with a two-lane bridge. Construction is planned to occur between Fall 2023 and Fall 2024, pending Council approval.

The Township of Woolwich has undertaken a Municipal Class Environmental Assessment to study the structural and physical deficiencies associated with Structure 400172 on Greenhouse Road. The purpose of this study is to determine the need and short- and long-term plan for the crossing. An integral component of this study will be consultation with directly affected stakeholders, agencies and the general public. The preferred alternative is replacement of the existing structure with a two-lane bridge. Construction is planned to occur between Fall 2023 and Fall 2024, pending Council approval.

Page last updated: 27 Mar 2024, 11:15 AM