GRT 2020 transit service improvements

Route 59 travelling past Churchill Park

GRT is planning service improvements this September as part of the 2020 Transit Service Improvement Plan. Routes serving south Galt, Elmwood, Northview and Saginaw areas would be redesigned to provide direct connections, more travel options and to increase ridership long-term.

The changes proposed will:

  • Replace one-way loop routes with more direct two-way routes
  • Provide better weekend and evening service
  • Provide more direct travel to major destinations, including:
    • Ainslie Terminal
    • South Cambridge Shopping Centre
    • Cambridge Centre Station
    • Di Pietro’s Plaza
    • Franklin/Saginaw area (No Frills plaza, St. Benedict High School)

Click on the photos on this page to see maps of the proposed changes, or view the 2020 Service Improvements page to see full descriptions of all the changes.

We want your feedback on the proposed plan! Take the survey below.

Use the subscribe button on this page to receive an email notification with future project updates.

GRT is planning service improvements this September as part of the 2020 Transit Service Improvement Plan. Routes serving south Galt, Elmwood, Northview and Saginaw areas would be redesigned to provide direct connections, more travel options and to increase ridership long-term.

The changes proposed will:

  • Replace one-way loop routes with more direct two-way routes
  • Provide better weekend and evening service
  • Provide more direct travel to major destinations, including:
    • Ainslie Terminal
    • South Cambridge Shopping Centre
    • Cambridge Centre Station
    • Di Pietro’s Plaza
    • Franklin/Saginaw area (No Frills plaza, St. Benedict High School)

Click on the photos on this page to see maps of the proposed changes, or view the 2020 Service Improvements page to see full descriptions of all the changes.

We want your feedback on the proposed plan! Take the survey below.

Use the subscribe button on this page to receive an email notification with future project updates.

  • CLOSED: This survey has concluded.

    This survey should take 5-10 minutes to complete. The survey will close on at 11:59 pm on February 29, 2019.

    You can also provide feedback in person at one of our upcoming public information centres.

    Your feedback will help us finalize the transit network redesign and service levels before the changes are made in fall 2020.

    This survey should take 5-10 minutes to complete. The survey will close on at 11:59 pm on February 29, 2019.

    You can also provide feedback in person at one of our upcoming public information centres.

    Your feedback will help us finalize the transit network redesign and service levels before the changes are made in fall 2020.

    Take Survey