News

Letter to Residents

24 February 2022

During the next few weeks, you may observe surveyors undertaking a detailed field survey in your neighbourhood. The survey is being completed in preparation for the reconstruction of the street(s) listed above.

In order to gather the required details, the survey will include the frontage of your property as well as the street. The purpose of this survey is to locate all existing features (trees, gardens, steps and walkways, etc.) on the plans for preliminary study and final design.

The surveyors should not interfere with your regular activities, but will identify themselves if you have any questions. The reconstruction is being done to replace the older, deteriorated underground services.

The following is a brief list of specific improvements being considered:

  • Upgrade the existing storm sewer, sanitary sewer and water mains as required.
  • Replace existing sanitary and water services from the new mains to the property line.
  • Curb and gutter, and sidewalks will be installed.
  • Upgrade the asphalt roadway.
  • In accordance with council policy staff will explore new sidewalk on Southdale Drive from 12 Southdale Avenue to Kehl Street.