As part of the City of Kitchener’s ongoing efforts to provide consistent and reliable service, we have scheduled road and sewer improvements in your neighbourhood on the streets listed above.
The reconstruction is being done to replace the older, deteriorated underground services. This is a brief list of specific improvements being considered:
- Upgrade the existing storm sewer, sanitary sewer and water mains, including additional hydrants as required
- Replace existing sanitary and water services from the new mains to the property line
- Curb and gutter, and sidewalks will be installed
- Upgrade the asphalt roadway
- Replace all driveway ramp entrances in concrete
- Install and/or replace retaining walls
- Cycling facilities
It is anticipated that construction will occur in the spring of 2027.