As part of the City of Kitchener’s work to provide consistent and reliable services, we are planning road and sewer improvements on the streets listed above.
Residents on affected streets will receive information before construction starts and updates throughout the project. Updates will also be posted below.
Construction is expected to start in April 2028 and finish by November 2028.
Planned improvements include:
- Upgrade the existing storm sewer, sanitary sewer, and water mains, including additional fire hydrants where needed
- Replace existing sanitary and water services from the new mains to the property line
- Replace curbs and gutters
- Upgrade the asphalt roadway
- Replace all driveway ramp entrances in concrete
- Install or replace retaining walls, as required
- Add sidewalks, to improve pedestrian safety
- Add cycling infrastructure to improve safety
and connectivity
- Add traffic calming for overall street safety
These improvements will replace aging underground pipes and road features, helping to reduce the risk of future service problems. The project will be funded through utility user fees. There will be no direct cost to homeowners.
Before construction begins, the City will offer inspections of homes and businesses in the construction area to record existing conditions. This helps protect property owners and is completely optional.