News

Construction update 4

8 October 2024

Note: Construction updates are being provided as a courtesy to keep residents appraised of upcoming work. Due to the nature of construction, schedules can quickly change and residents should be prepared for unexpected changes.

The current plan for construction over the two week period from October 7 to 18, 2024 is:

  • Phase 1 – Moore Ave S
    1. Restore asphalt and interlocking brick driveways.
    2. Prep boulevards, topsoil and sod.
    3. Line painting.
    4. Installing/reinstalling signage.
  • Phase 2 – Waterloo St
    1. Commission new watermain.
    2. Continue replacement of storm sewer.
    3. Final connections of new watermain to existing watermain.