Share Woolwich Street North Reconstruction on FacebookShare Woolwich Street North Reconstruction on TwitterShare Woolwich Street North Reconstruction on LinkedinEmail Woolwich Street North Reconstruction link
The Township of Woolwich is currently working with GM BluePlan on the engineering design of Woolwich Street North in Breslau. Construction timing is undetermined currently and is subject to Council’s final approval.
The scope of the Woolwich Street North reconstruction is to include the construction of watermain, sanitary sewer, storm sewer, services to property line and appurtenances. The watermain is proposed to be extended to Beacon Court. Surface works are to include new concrete curb and gutter, 1.5m wide sidewalk and a new pavement structure with a new granular base and asphalt. Any areas disturbed because of the construction project such as walkways, driveways and grassed areas will be restored to Township standards.
The Township of Woolwich is currently working with GM BluePlan on the engineering design of Woolwich Street North in Breslau. Construction timing is undetermined currently and is subject to Council’s final approval.
The scope of the Woolwich Street North reconstruction is to include the construction of watermain, sanitary sewer, storm sewer, services to property line and appurtenances. The watermain is proposed to be extended to Beacon Court. Surface works are to include new concrete curb and gutter, 1.5m wide sidewalk and a new pavement structure with a new granular base and asphalt. Any areas disturbed because of the construction project such as walkways, driveways and grassed areas will be restored to Township standards.