Project staging overview
Note: This information represents our suggested project staging, and is subject to change once the Contractor is awarded and provides their input.
Phasing plan
Interim phase (2022)
- Separated bike facility from Columbia Street to Longwood Drive (the portion of the road that includes of watermain work)
- Interim line painting to continue bike facility from Longwood Drive to Weber Street
- Existing pathway between Longwood Drive and Weber Street
Ultimate phase (TBD)
- Physically separate bike facility from Longwood Drive to Weber Street
Staging Plan Phase 1 Summary
Phase 1 will be on Albert Street, between Phillip Street and Longwood Drive
Phase 1A (detailed posting with diagrams)
- Organize traffic control
- Remove existing surface
- Install, commission and connect temporary watermain
- Install watermain up to connection limits
- Restoration of curbs and pave
Phase 1B (detailed posting with diagrams)
- Transfer traffic to newly paved areas
- Extend services to property line on long service side
- Commission and connect watermain
- Surface restorations and pave
Staging Plan Phase 2 Summary
Phase 2 will be on Albert Street, between Columbia Street and Phillip Street
Phase 2 (detailed posting with diagrams)
- Install islands, separator curbs, line painting etc.
- Remove existing surface features
- Install watermain up to connection limits
- Surface restorations, curbs, separator curbs, pedestrian islands and paving
During this phase Albert Street will be closed between Columbia Street to Phillip Street for through traffic, although local traffic access will be available at all times.
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends