As part of the City of Kitchener’s ongoing efforts to provide exceptional service, staff has scheduled road and sewer improvements in your neighbourhood.

These improvements are scheduled to begin April 2025, with an estimated completion date of November 2025.

The following is a brief list of the improvements being considered:

    • Upgrade the existing storm sewer, sanitary sewer and water mains, including additional hydrants as required
    • Replace existing sanitary and water services from the new mains to the property line
    • Curb and gutter, and sidewalks will be installed
    • Upgrade the asphalt roadway
    • Replace all driveway ramp entrances in concrete
    • Install and/or replace retaining walls

These improvements are being done to upgrade the existing, deteriorated underground services and above-ground surface features, in order to prevent future system failure. The project will be funded through utility user fees and will not result in a direct charge to the homeowner.

Important information

Learn more about the project and how construction may affect you

Updates

Questionnaires

The Survey has now concluded.

Resident/Owner Questionnaire

This survey will ask you about things we may need to consider when planning this road reconstruction. It will also ask you whether you are interested in a storm drain connection.

We appreciate your cooperation. A city staff member may contact you if we need more information about your comments.

If you have any questions, contact Steve Allen, Engineering Manager, at steve.allen@kitchener.ca(External link) or 519-741-2200 x7584

Map of construction area

Map of construction area