Reimagining Westwood Park

Share Reimagining Westwood Park on Facebook Share Reimagining Westwood Park on Twitter Share Reimagining Westwood Park on Linkedin Email Reimagining Westwood Park link

Westwood Park is an established neighbourhood park within a changing community. The green space was formerly shared with an adjacent school that has since been demolished and is being developed into townhomes. With this project, the intent is to revitalize the park by upgrading existing features to modern standards, and providing elements and features that reflect the needs of the community.

The City is working with a team of consultants from SHIFT Landscape Architecture to lead the redevelopment of this space, including conceptual design, final design, and seeing the project through construction.

During the summer of 2021, the design team engaged with the public to better understand how the community uses the park. This feedback was used to inform design decisions. As a starting point for discussion, two concepts were developed to show what is possible in the space. After hearing feedback in person and online, and looking at what is needed to bring the park up to current standards, a final concept has been developed.

We are excited to reveal the final concept for Westwood Park. Please review the plan below and the overview video. More information can also be found through the links on this page, including timelines for next steps, additional documents, and a summary of engagement input.


Westwood Park is an established neighbourhood park within a changing community. The green space was formerly shared with an adjacent school that has since been demolished and is being developed into townhomes. With this project, the intent is to revitalize the park by upgrading existing features to modern standards, and providing elements and features that reflect the needs of the community.

The City is working with a team of consultants from SHIFT Landscape Architecture to lead the redevelopment of this space, including conceptual design, final design, and seeing the project through construction.

During the summer of 2021, the design team engaged with the public to better understand how the community uses the park. This feedback was used to inform design decisions. As a starting point for discussion, two concepts were developed to show what is possible in the space. After hearing feedback in person and online, and looking at what is needed to bring the park up to current standards, a final concept has been developed.

We are excited to reveal the final concept for Westwood Park. Please review the plan below and the overview video. More information can also be found through the links on this page, including timelines for next steps, additional documents, and a summary of engagement input.


Discussions: All (1) Open (0)
  • Online forum

    over 2 years ago
    Share Online forum on Facebook Share Online forum on Twitter Share Online forum on Linkedin Email Online forum link
    CLOSED: This discussion has concluded. Thank you to everyone who took part in our online forum!

    You need to be signed in to add your comment.

    We know people are tired of virtual meetings but are perhaps not yet comfortable with in person events, so we’ll be doing this public consultation a different way. 

    Have a question? You will have the opportunity to ask the project team directly about the Westwood Park project from August 9 to August 13.  We will be closely monitoring this forum during business hours, answering your questions in real time.

    Replies Closed
Page last updated: 10 Apr 2024, 02:07 PM